 11- The corridor's 
        floor in ochre yellow hydrologic mosaic was removed giving place to a 
        Traditional Portuguese wooden floor. Detail of the corridor showing the 
        already mentioned pathologies and the obtained result after being corrected. 
        
 12- Kitchen: the old ruined cupboards, kitchen working bench and 
        tiles were removed. They didn't match , with the existing architecture, 
        according to us. They were replaced by new ones. We would like to mentioned 
        the new tile hand painted frame and the rustic handicraft pavement tiles.
 
 13- In the existing 
        bathrooms our changes was centered in replacing the wall and pavement 
        coverings keeping the old ceramics, and being careful to let prevail the 
        same type of architecture and in the transition band between tiles and 
        stucco.
 
 14- Fungis in the stuccos and rotten wooden 
        ceilings in the zones of more infiltration were evident. We used "estafes" 
        (linseed bases) supported by new wooden elements while rebuilding them, 
        following the same construction process.
 
 15- Detail of the corridor showing the already 
        mentioned pathologies and the obtained result after correcting them.
 
 
 
 
 
 
 
 |