Details of the beginning and study of the tile panel laying
start. This is the longest phase for the technician that wants to
leave the start as orientation guide.
 |

|
|
 |
Details of the tile
panel laying. Due to the natural irregularities of this kind of tile the
job is slow, as it is necessary to lay tile by tile and constantly verify
the level and the vertical plumb line. One of the things the technician
has in mind is to follow the labelling of the tiles carried out when they
were removed in order not do change or misplace some of them.
|