Total
budget: |
17.835.000$00
|
Partial
budget: |
|
Earth
movement |
430.000$00
|
Demolitions |
1.150.000$00
|
Stone
masonry and masonry in bricks |
1.950.000$00
|
Concrete |
2.150.000$00
|
Carpentry
|
3.850.000$00
|
Wall
and floor covering |
1.750.000$00
|
Roof
lining |
1.450.000$00
|
Stonecutting |
850.000$00
|
Painting
|
1.450.000$00
|
Plumming
(water and sewerage) |
1.225.000$00
|
Electrical
system |
950.000$00
|
Saundry
|
630.000$00
|